Two-story, 17,000 SF office building, with rooftop package HVAC systems, split system heat pumps, core toilet room facilities, computer server room with dedicated HVAC units, and specialized a/c and ventilation system for a large (3000 SF) conference room .
MEC was responsible for mechanical and electrical design services for the shell and tenant fit-out permit drawings. Construction will be complete in 2006.